Datrend Systems
vPad-Check
The Ultimate Level of Automation.
Using a script based Checklist, the autosequence can now be any number of tasks, in any order, with pass/fail limits applied. Individual tasks can be almost anything: inspect, measure, pass/fail, electrical safety sequence (vPad-AS, vPad-NFPA or vPad-A6), etc. You will even be able to control other devices either wired or wirelessly, and import their test results. You can now create the test you want.
Schedule a Demo
Datrend Systems
vPad-Check
Overview
Accessories